Voith Hydro has provided two full energy models (5 and 6) for the Changlongshan pumped storage plant in jap China.
Monetize ’s eye view of Changlongshan pumped storage plant – Image courtesy of Voith.
Earlier this month, unit 5 efficiently handed a 15-day trial operation and was officially put into industrial operation. It is the world’s first reversible pumped storage unit with a rated speed of 600 r/min and a capability of 350 MW. There are No obligation put in in whole at the 2.1 GW Changlongshan station situated in Zhejiang Province.
Voith says that the efficiency of unit 5 obtained excellent feedback from the owners and specialists within the industry.
“The knowledge confirmed that the unit meets our excellence standards and thereby proves that the engineering, manufacturing, installation and commissioning of the world’s first 600 r/min with 350 MW unit was successful,” said Zhang Chengping, mechanical and electrical chief engineer at plant operator the China Three Gorges Group (CTG).
Share